tiprankstipranks
Trending News
More News >
Bannerman Energy (AU:BMN)
ASX:BMN
Australian Market

Bannerman Energy (BMN) Earnings Dates, Call Summary & Reports

Compare
85 Followers

Earnings Data

Report Date
Sep 17, 2026
TBA (Confirmed)
Period Ending
2026 (Q4)
Consensus EPS Forecast
>-0.01
Last Year’s EPS
>-0.01
Same Quarter Last Year
Based on 3 Analysts Ratings

Earnings Call Summary

Q2 2026
Earnings Call Date:Mar 03, 2026|
% Change Since:
|
Earnings Call Sentiment|Positive
The call conveyed a predominately positive operational and financial picture: strong safety and execution on early works, equipment deliveries, robust liquidity (AUD 89.0m cash + AUD 12.7m liquid assets), mobilized workforce, signed power agreement and a binding water MoU, and preserved expansion optionality. Near-term risks include FID timing (target 6–12 months), two major construction contracts yet to be awarded, and finalization of the NamWater contract (administrative delays). Management reports increasing market interest and secured mechanical pricing which mitigates some cost risk. On balance, operational progress and balance sheet strength outweigh the outstanding execution and approval items.
Company Guidance
Guidance from the March 3, 2026 call was that Bannerman remains on schedule and funded to progress Etango: management expects FID within 6–12 months and to deliver first uranium to market by 2029; the company finished the quarter with AUD 89.0m cash, AUD 12.7m additional liquid assets and no debt; site safety is 16 years LTI‑free; headcount rose from ~100 to 373 (just under 400) this quarter; the heap‑leach pad is 1 km x 300 m with the first 3 cells complete; the HPGR passed factory acceptance testing and has been delivered; a ~1,200 m3 continuous concrete pour was completed, primary crusher concrete is roughly +/−30% complete with ~50% of tower reinforcement at ground level; project spent and committed is just under one‑third (~33%) of the overall budget, with two major contracts remaining (structural steel construction and electrical & instrumentation) and most mechanical orders placed; NamPower’s power agreement is signed with a deposit paid and NamWater is under a binding MoU enabling permanent water‑line construction (second desalination plant approval expected midyear), and infrastructure (power and water) and site layout preserve optionality to expand from Etango‑8 to Etango‑16.
Strong Safety Record
16 years without a lost time injury (LTI) at site, demonstrating strong safety culture and effective site management during transition from exploration to construction.
Robust Liquidity and Balance Sheet
Cash balance of AUD 89.0 million plus additional liquid assets of AUD 12.7 million (total ~AUD 101.7 million) and no debt, providing runway for ongoing construction and financing flexibility.
On-Budget and On-Schedule Early Works
Early works construction activities progressed in line with budget and schedule; significant contractors mobilized and key civil and concrete works advancing, including a major continuous concrete pour of over 1,200 m3.
Major Equipment Delivered
Factory acceptance test of the high-pressure grind roller (HPGR) completed and the unit successfully delivered to site — proof of successful equipment procurement and import processes.
Progress on Key Plant Civil Works
Heap leach pad (1 km x 300 m) has first 3 cells completed; primary crusher concrete works ~30% complete with tower reinforcement ~50% installed; tertiary crusher and stockpile tunnel foundations progressing.
Rapid Workforce Ramp-Up
On-site personnel increased from roughly 100 to ~373 during the quarter (approx. +273%), with induction and medical processes efficiently managed to minimize onboarding delays.
Project Spend Visibility and Procurement Progress
Spent and committed project expenditure is ~just under one-third (~33%) of overall budget; major mechanical orders placed to secure pricing, improving cost certainty.
Utility and Infrastructure Milestones
Power agreement with NamPower signed and initial deposit paid; design work for substation started. Binding MoU with NamWater in place enabling commencement of permanent water supply line construction.
Expansion Optionality Preserved
Power and water infrastructure is sized to accommodate planned expansion (Etango-8 to Etango-16), allowing potential scale-up without major rework; site layout allows extension build while operating main plant.
Positive Market & Financing Momentum
Management cites rising uranium spot price (~USD 87 at the time of call) and increased investor interest over the past 6 months; strategic funding workstream progressing and FID targeted within 6–12 months while maintaining project momentum.
Local Contractor Performance
All on-site contractors are Namibian, delivering strong schedule adherence, safety performance and commitment — viewed as a strategic success and local capacity demonstration.

Bannerman Energy (AU:BMN) Earnings, Revenues Date & History

The upcoming earnings date is based on a company’s previous reporting, and may be updated when the actual date is announced

AU:BMN Earnings History

Report Date
Fiscal Quarter
Forecast / EPS
Last Year's EPS
EPS YoY Change
Press Release
Slides
Play Transcript
Sep 17, 2026
2026 (Q4)
>-0.01 / -
-0.008
Mar 03, 2026
2026 (Q2)
>-0.01 / >-0.01
-0.01776.47% (+0.01)
Sep 24, 2025
2025 (Q4)
>-0.01 / >-0.01
-0.02365.22% (+0.01)
Mar 05, 2025
2025 (Q2)
- / -0.02
-0.04158.54% (+0.02)
Sep 19, 2024
2024 (Q4)
- / -0.02
-0.012-91.67% (-0.01)
Mar 06, 2024
2024 (Q2)
- / -0.04
-0.02-105.00% (-0.02)
Sep 24, 2023
2023 (Q4)
- / -0.01
-0.01520.00% (<+0.01)
Mar 08, 2023
2023 (Q2)
- / -0.02
-0.012-66.67% (>-0.01)
Sep 23, 2022
2022 (Q4)
- / -0.01
-0.01-50.00% (>-0.01)
Mar 10, 2022
2022 (Q2)
- / -0.01
-0.01-20.00% (>-0.01)
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.
Beat
Missed

AU:BMN Earnings-Related Price Changes

Report Date
Price 1 Day Before
Price 1 Day After
Percentage Change
Mar 03, 2026
AU$4.79
Sep 24, 2025
AU$3.75AU$3.72-0.80%
Mar 05, 2025
AU$2.19AU$2.24+2.28%
Sep 19, 2024
AU$2.48AU$2.39-3.63%
Earnings announcements can affect a stock’s price. This table shows the stock's price the day before and the day after recent earnings reports, including the percentage change.

FAQ

When does Bannerman Energy (AU:BMN) report earnings?
Bannerman Energy (AU:BMN) is schdueled to report earning on Sep 17, 2026, TBA (Confirmed).
    What is Bannerman Energy (AU:BMN) earnings time?
    Bannerman Energy (AU:BMN) earnings time is at Sep 17, 2026, TBA (Confirmed).
      Where can I see when companies are reporting earnings?
      You can see which companies are reporting today on our designated earnings calendar.
        What companies are reporting earnings today?
        You can see a list of the companies which are reporting today on TipRanks earnings calendar.
          What is the P/E ratio of Bannerman Energy stock?
          The P/E ratio of Bannerman Energy is N/A.
            What is AU:BMN EPS forecast?
            AU:BMN EPS forecast for the fiscal quarter 2026 (Q4) is >-0.01.