tiprankstipranks
Atlas Energy Solutions (AESI)
NYSE:AESI
US Market
Want to see AESI full AI Analyst Report?

Atlas Energy Solutions (AESI) Earnings Dates, Call Summary & Reports

285 Followers

Earnings Data

Report Date
Aug 10, 2026
After Close (Confirmed)
Period Ending
2026 (Q2)
Consensus EPS Forecast
-0.13
Last Year’s EPS
-0.04
Same Quarter Last Year
Based on 9 Analysts Ratings

Earnings Call Summary

Q1 2026
Earnings Call Date:May 04, 2026|
% Change Since:
|
Earnings Call Sentiment|Positive
The call conveyed strong commercial momentum — notably in power (1.4 GW framework, 240 MW initial order, first 120 MW PPA) and recovering logistics margins — and management provided bullish Q2 EBITDA guidance (~$50M, ~76% sequential uplift). Transitory Q1 operational headwinds (weather, maintenance, diesel/trucking cost volatility), capital intensity from the power buildout and sand price/capacity dynamics create near-term execution and timing risk. On balance, the strategic wins (secure equipment supply, large PPA / framework agreement, sold-out Q2 capacity, improved logistics margins and financing that lowers cash interest) materially outweigh the near-term operational and funding-related challenges.
Company Guidance
Management guided toward a stronger Q2 and full‑year 2026 driven by recovering sand/logistics and fast power commercialization: Q1 revenue was $265.5M with EBITDA $28.4M (11% margin) and Q2 EBITDA is guided to about $50M (≈76% sequential increase) as the company is effectively sold out for Q2 and expects sequentially higher volumes; Q1 proppant volume was 5.7M tons (plus ~130k t third‑party), logistics deliveries hit a record 5.5M tons, Q1 proppant ASP was ~$18.19/ton (Q2 ASP expected slightly below $18/ton), Q1 proppant plant OpEx was ~$13.86/ton (incl. royalties) with OpEx per ton forecast ~ $12.75 in Q2 and trending toward the low‑$11s by Sept/Oct and high‑$10s run‑rate longer term; logistics margins moved from low single digits in January to mid‑teens by March and are expected to be mid‑teens in Q2; management expects ~ $35M of incremental adjusted EBITDA from bridge/microgrid deployments over the remaining 9 months of 2026 and the announced 120 MW PPA (from the initial 240 MW order) to generate roughly $50–55M of annualized adjusted free cash flow once fully deployed; power commitments include the 240 MW initial order plus a global framework with Caterpillar securing an additional 1.4 GW for 2027–29 (supporting an objective of >2 GW owned/operated by 2030 and ~550 MW of deployments next year), 2026 CapEx is now guided to approximately $350–375M (maintenance CapEx ≈ $45M; growth ≈ $305–330M), Q1 cash SG&A ex‑litigation was $23.3M (guidance ~$21–22M/quarter ex‑litigation), and the company completed a $450M 0.5% convertible note (net proceeds ~$386M; capped call initial cap $22.32, 28% premium to $17.38) to strengthen the balance sheet and finance power buildout.
Power Commercial Momentum and Large Equipment Commitments
Signed a global framework agreement with Caterpillar for 1.4 GW of generation capacity plus an initial 240 MW order (total commitments ~1.64 GW); objective to own and operate >2 GW by 2030. Announced first private-grid PPA for 120 MW expected to generate ~$50–$55 million of adjusted free cash flow annually once fully deployed.
Material Near-Term Power EBITDA / FCF Contributions
Bridge power and microgrid deployments (including mobile generators) expected to contribute approximately $35 million of incremental adjusted EBITDA over the remaining 9 months of 2026, weighted to the back half of the year.
Revenue and Q1 Profitability
Q1 2026 revenue of $265.5 million and EBITDA of $28.4 million, yielding an EBITDA margin of 11% despite weather and maintenance headwinds.
Strong Q2 Guidance — Meaningful Sequential EBITDA Upside
Management expects Q2 EBITDA to be approximately $50 million, a ~76% sequential increase versus Q1, with volumes guided to be up sequentially and the business effectively sold out of capacity for Q2 at current production rates.
Logistics Operational Strength and Margin Recovery
Logistics set a quarterly delivery record of 5.5 million tons; logistics revenue of $139.1 million in Q1. Logistics margins improved from low-single digits in January to mid-teens by March and are forecasted to remain in the mid-teens for Q2. National freight rates are ~800 basis points higher vs. 2025.
Proppant Volumes
Total proppant sales volume rose sequentially to 5.7 million tons in Q1 (plus ~130k tons of third-party sand purchases); average realized proppant price in Q1 was ~$18.19/ton (Q2 expected slightly below $18/ton).
Balance Sheet / Financing Strength
Priced $450 million of 0.5% convertible senior notes due 2031; net proceeds ($386 million) used to pay down ABL and master lease advances; concurrent capped call with initial cap price $22.32 (28% premium to prior close) and reduction in cash interest on this capital from high-single digits to 0.5%.
Infrastructure and Competitive Advantages
Continued investment in differentiated infrastructure (Dune Express electric conveyor, mobile mines, dredges) enhances reliability and lowers exposure to diesel volatility; company positions itself as a 'surety of delivery' supplier which has attracted higher-quality power counterparties (including data centers).

Atlas Energy Solutions (AESI) Earnings, Revenues Date & History

The upcoming earnings date is based on a company’s previous reporting, and may be updated when the actual date is announced

AESI Earnings History

Report Date
Fiscal Quarter
Forecast / EPS
Last Year's EPS
EPS YoY Change
Press Release
Slides
Play Transcript
Aug 10, 2026
2026 (Q2)
-0.13 / -
-0.04
May 04, 2026
2026 (Q1)
-0.25 / -0.38
0.01-3900.00% (-0.39)
Feb 23, 2026
2025 (Q4)
-0.23 / -0.18
0.13-238.46% (-0.31)
Nov 03, 2025
2025 (Q3)
>-0.01 / -0.19
0.04-575.00% (-0.23)
Aug 04, 2025
2025 (Q2)
0.11 / -0.04
0.13-130.77% (-0.17)
May 05, 2025
2025 (Q1)
0.17 / 0.01
0.26-96.15% (-0.25)
Feb 24, 2025
2024 (Q4)
0.16 / 0.13
0.406-67.98% (-0.28)
Oct 28, 2024
2024 (Q3)
0.29 / 0.04
0.567-92.95% (-0.53)
Aug 05, 2024
2024 (Q2)
0.29 / 0.13
0.67-80.60% (-0.54)
May 06, 2024
2024 (Q1)
0.38 / 0.26
0.629-58.66% (-0.37)
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.
Beat
Missed

AESI Earnings-Related Price Changes

Report Date
Price 1 Day Before
Price 1 Day After
Percentage Change
May 04, 2026
$17.75$19.22+8.28%
Feb 23, 2026
$11.00$10.37-5.73%
Nov 03, 2025
$12.65$10.64-15.89%
Aug 04, 2025
$12.14$12.31+1.40%
Earnings announcements can affect a stock’s price. This table shows the stock's price the day before and the day after recent earnings reports, including the percentage change.

FAQ

When does Atlas Energy Solutions (AESI) report earnings?
Atlas Energy Solutions (AESI) is schdueled to report earning on Aug 10, 2026, After Close (Confirmed).
    What is Atlas Energy Solutions (AESI) earnings time?
    Atlas Energy Solutions (AESI) earnings time is at Aug 10, 2026, After Close (Confirmed).
      Where can I see when companies are reporting earnings?
      You can see which companies are reporting today on our designated earnings calendar.
        What companies are reporting earnings today?
        You can see a list of the companies which are reporting today on TipRanks earnings calendar.
          What is AESI EPS forecast?
          AESI EPS forecast for the fiscal quarter 2026 (Q2) is -0.13.