Marathon Gold Corporation provides assay results on the final twenty-six in-fill drill holes completed during 2022 at the Berry Deposit, part of the Valentine Gold Project located in central Newfoundland. Matt Manson, President and CEO, commented: "With this final batch of 2022 Berry drill results, we continue to see intercepts of high-grade mineralization outside of Berry’s currently modeled mineralized domains. As a reminder, this in-fill program was designed to target areas of the deposit assessed to comprise primarily un-mineralized waste rock. As with our previous batch of results, we are delineating a sizeable domain of quartz-tourmaline-pyrite veining at the base of the mineral resource pit shell. In this case, it is at the northeastern limit of the deposit and represents the deeper extension of one of three northeast plunging ore shoots. This area was targeted with an extension of the 2020 diamond drill hole VL-20-882, and is illustrated in long-section in Figure 4 and cross-section in Figures 5 and 6. The 2022 in-fill drilling at Berry has been very successful in delivering new areas of mineralization, and supports our assessment that additional mineable ounces remain to be delineated within the scope of the Project’s current mine plan."
Claim 55% Off TipRanks
- Unlock hedge fund-level data and powerful investing tools for smarter, sharper decisions
- Discover top-performing stock ideas and upgrade to a portfolio of market leaders with Smart Investor Picks
Published first on TheFly
See Insiders’ Hot Stocks on TipRanks >>
Read More on MGDPF:
- Marathon Gold Delineates Additional In-Fill Gold Mineralization at Berry Deposit, Valentine Gold Project
- Marathon Gold exercises buy back option on Valentine royalty
- Marathon Gold Upsized, Amended and Restated US$225M Credit Facility for the Valentine Gold Project
- Marathon Gold Exercises Buy Back Option on Valentine Royalty
- Marathon upsized amended, restated $225M credit facility for Valentine Gold
