Aldebaran Resources (ADBRF) announces that field activities are progressing very well at the Altar copper-gold project, with 18,267.5 m of drilling having been completed to date. So far this field season, the Company has completed: 5,977.5 m of drilling for metallurgical samples required for the Phase 2 Nuton leaching program; Material for the Phase 2 Nuton leaching program has been selected and shipped to Nuton for analysis; 12,310 m of drilling to infill areas of mineralization that are currently classified as inferred resources that will need to be upgraded to measured and indicated; Where possible, these holes were designed to infill and upgrade known mineralization but also target areas classified as waste due to lack of drilling.
Claim 50% Off TipRanks Premium and Invest with Confidence
- Unlock hedge-fund level data and powerful investing tools designed to help you make smarter, sharper decisions
- Stay ahead of the market with the latest news and analysis so your portfolio is always positioned for maximum potential
