Silver Tiger Metals (TSE:SLVR) has released an update.
Claim 50% Off TipRanks Premium and Invest with Confidence
- Unlock hedge-fund level data and powerful investing tools designed to help you make smarter, sharper decisions
- Stay ahead of the market with the latest news and analysis so your portfolio is always positioned for maximum potential
Silver Tiger Metals announced the filing of a Preliminary Feasibility Study for the El Tigre silver-gold project in Sonora, Mexico, revealing a promising after-tax net present value of $222 million and a 40% internal rate of return. The project is expected to have a 10-year mine life with an average annual production of 4.8 million silver equivalent ounces. Initial capital costs are projected at $86.8 million with a payback period of just two years.
For further insights into TSE:SLVR stock, check out TipRanks’ Stock Analysis page.

