Osisko Metals Incorporated (TSE:OM) has released an update.
Elevate Your Investing Strategy:
- Take advantage of TipRanks Premium at 50% off! Unlock powerful investing tools, advanced data, and expert analyst insights to help you invest with confidence.
Osisko Metals Incorporated has updated its Mineral Resource Estimate for the Pine Point Project, revealing a substantial 49.5 million tonnes of indicated resources with a 5.52% zinc equivalent grade, alongside 8.3 million tonnes of inferred resources at 5.64% zinc equivalent. This marks a major increase of 214% in indicated resource tonnage from the previous estimate, setting a solid foundation for the upcoming Feasibility Study. The project boasts significant infrastructure advantages, including paved roads, railhead access, and an on-site hydroelectric substation, enhancing its development prospects.
For further insights into TSE:OM stock, check out TipRanks’ Stock Analysis page.