PremiumPress ReleasesBrixton Metals Provides Assays from the Second Camp Creek Drill Hole of the 2024 Exploration Program with an Upper 61.5m Gold Dominant Zone and a Lower 1126.05m Interval of Porphyry Copper Dominant Zone
Brixton Metals Provides Initial Assays from the 2024 Drill Program at its Thorn Project with 1467.73m of Copper-Gold-Silver-Molybdenum with Several Sub-intervals: