Giyani Gold (TSE:EMM) has released an update.
Claim 50% Off TipRanks Premium and Invest with Confidence
- Unlock hedge-fund level data and powerful investing tools designed to help you make smarter, sharper decisions
- Stay ahead of the market with the latest news and analysis so your portfolio is always positioned for maximum potential
Giyani Metals Corp. is advancing its K.Hill Battery-Grade Manganese Project with the construction of a Demonstration Plant that aims to optimize battery-grade manganese production and eliminate the use of hazardous materials. The plant, on track to commence production in Q4 2024, is expected to produce up to 600kg per day for potential offtake partners. Moreover, the company has engaged Minopex to operate the plant and is simultaneously conducting a Definitive Feasibility Study.
For further insights into TSE:EMM stock, check out TipRanks’ Stock Analysis page.

